Risk Identification and Management of the Patna Metro Corridor PC 04 of Phase-1 from Danapur to Patliputra at Patna in Bihar

Sakir Khan1
Gaurav Shukla2

1 Information to be updated, India

2 Information to be updated, India

Published: July 1, 2025Vol. 4, No. 1, pp. 1-1410.55953/JERA.2025.01
Download PDF

Abstract

This paper analyses a study of the Patna Metro corridor PC-04 of phase-1, which runs from Danapur to Patliputra in Patna, Bihar, to examine how different hazards related to metro construction are measured and managed. Identification of risks associated with various project activities is made possible in large part by project risk management. The Metro Rail organisation and its officials have recognised certain risks that can emerge during construction and raise the possibility of collisions, especially on busy roads. It is particularly difficult to manage these risks in the metro rail system when it comes to crucial operations. In order to reduce the likelihood of accidents, strict risk and safety management criteria are followed, given the metro's relevance to national pride. These rules must be followed by all contractors working on the project in order to reduce deaths and guarantee safety.

Keywords

SafetyMetro RailRisk IdentificationManagementConstruction

How to Cite

Sakir Khan, Gaurav Shukla (2025). Risk Identification and Management of the Patna Metro Corridor PC 04 of Phase-1 from Danapur to Patliputra at Patna in Bihar. Journal of Engineering Research and Application, 4(1), 1-14. https://doi.org/10.55953/JERA.2025.01

Full Text

Full text available as PDF

The complete article including all figures, tables, and references is available for free download.

Download Full Article (PDF)
Risk Identification and Management of the Patna Metro Corridor PC 04 of Phase-1 from Danapur to Patliputra at Patna in Bihar | JERA